MIP 31: Product Sunset Approach
Author | Dimitri Golecko, Nick Addison, Cesar Chavez |
---|---|
Discussions-To | https://forum.mstable.org/t/mip-31-product-sunset-approach/992 |
Status | Approved |
Created | 2023-02-27 |
Simple Summary
This proposal outlines a sunset process and smart contract changes to products as specified in MIP 29.
It is important to note that this proposal is not indented to propose or discuss whether to sunset the products or not but rather in the case that the subsequent proposals to sunset are voted upon there is a set of clear guides and requirements specified to follow.
Abstract
Important comment upfront:
- This MIP is NOT to discuss whether to sunset or not, this will be part of a future proposal. But in light of MIP 29, we need to prepare for the eventuality of the shutdown of the products and how it’s going to be handled on a smart contract level.
- This MIP outlines HOW to sunset the products and to offer transparency around the guiding principles, methodology and smart contract changes/upgrades.
- The actual decision to execute this will be done in a future proposal. A future proposal will be made that is referenced in MIP 29 that will offer options for proposed continuation as well as to pursue the shutdown.
- In the case that a proposal for Merge/Acquisition/Continuation is successful, this Proposal and the formal proposal resulting from it will be superseded by the winning proposal
This document serves to discuss the guiding principles and methodology for sunsetting the products and their smart contracts in accordance with MIP 29.
The first guiding principle for sunsetting the products and their smart contracts is to allow user withdrawals at any time in the future and to never lock user funds. This means that any user will be able to access their funds at any point in the future, with no restrictions. It also means that users can be sure that their funds are safe, as they are not kept locked away in the contract.
The second principle is to remove all integration contracts such as Aave and Compound, meaning that all of the benefits associated with keeping funds within the contracts will be eliminated. This includes the ability to earn interest on deposits and any rewards. Furthermore, all fees will be set to zero to allow natural arbitrage to flow freely, without the user being able to earn, while also allowing for easier withdrawals with fewer fees in any basket asset.
The third principle is to remove all ownership from contracts held by the ProtocolDAO. This means removing the ability to change parameters, upgrading contracts, and finally renouncing all ownership of the nexus contract and the delayed upgradable proxy.
The fourth principle of open-source projects is to make any remaining repositories that have not yet been made publicly available to the community. This is an important step towards allowing other developers to benefit from the work of the project, as it allows them to access the code and build upon it.
The fifth principle is to communicate the sunset of deployed apps, landing pages, and social channels. This will allow for withdrawals on the hosted front end for a period of at least 6 months starting after the vote of the sunset in the subsequent proposal has been conducted. After this, withdrawals can still be made using locally hosted front-ends or through direct smart contract interaction, such as Etherscan.
Motivation
The motivation behind this MIP is to ensure a swift and secure transition for the sunset of the products while allowing users to remain in control of their funds and access them at any time in the future, removing ownership from contracts held by the ProtocolDAO on behalf of MTA Governors / mStable DAO.
Data on Ethereum and Polygon don’t have an expiration date and our smart contracts should reflect this fact. Any user, no matter when they chose to withdraw, should get their assets back.
It’s important to keep in mind that any changes made to a system may require a significant amount of time to implement properly. Once the changes are in place, it’s also essential to test them thoroughly to ensure that they function as intended. Only after thorough testing should the changes be deployed into the live environment to minimize the risk of any potential issues arising. All of these steps are critical to ensuring that changes are made safely and effectively.
Specification
Outlined here is the high-level approach to the sunset of each product. Staking contracts are excluded here and will be further specified in another proposal outlining MTA procedure.
mAssets and Save
- Upgrade the mAssets’s
migrateBassets
to support migrating bAssets from platforms back to the mAsset contract - Remove platform integration
- Set swap and redeem fee to 0
- Set new min-max weights (5% and 95%)
- This applies to mUSD and mBTC on Ethereum mainnet and to mUSD on Polygon
Feeder Pools
- Upgrade the Feeder Pool’s
migrateBassets
to support migrating bAssets from platforms back to the Feeder Pool contract - Remove integration contracts if present
- Set swap and redeem fee to 0
- This applies to mUSD and mBTC on Ethereum mainnet and to mUSD on Polygon
- Exception: GUSD is still integrated with Iron Bank, a full withdrawal from the integration contract to cache as specified in MIP 23 was not possible without further changes. The GUSD contract will be adjusted to allow partial migration of assets back to the cache.
Meta Vault
- Upgrade contracts to add functionality to withdraw from underlying
- Withdraw all assets back to the contract
- Modify deposit and redeem functions to not do anything for all vaults (Convex, Curve, and Cache Meta Vault)
Automated Tasks
- All automated tasks will be disabled
- This applies to mAssets, Feeder Pools, Emissions Controller, and Meta Vault
Front-ends
- In all front-ends and the landing page, a banner will be added to notify everyone of the sunsetting of the product and to encourage withdrawals.
- The front-end will be kept alive for at least 6 months after the vote of the sunset in the subsequent proposal has been conducted.
- The possibility to access the contracts afterward is still possible via a locally run front-end or directly with the smart contracts (i.e. Etherscan).
Nexus
- Set new governor to address dead:
0x000000000000000000000000000000000000dEaD
- Once the governor’s ownership has been renounced, the following is locked into place so this would be the very last on-chain transaction by the protocol governor
- all modules in the Nexus. eg Liquidator and SavingManager addresses
- All proxy contracts can no longer be upgraded
- This should be the very last step and requires that the staking contracts upgrades/changes are resolved as well
Technical Specifications
This section outlines the more technical adjustments of the smart contracts and transactions that will be made in order to implement a sunset.
mAssets and Save
The following changes will be made to the smart contracts in order to implement the sunset process for the mAssets and Save products.
mUSD mainnet contract changes
- Rename the
Manager
library toMassetManagerV4
so the new library can be deployed and not the old library. - Upgrade the
migrateBassets
function in theMassetManagerV4
library so the new integration contract can be a zero address. This will withdraw all the bAssets from the old integrated platform and leave the bAssets in the mUSD contract. - Rename the
MusdV3
contract toMusdV4
so the new mUSD implementation can be deployed. - Remove the
upgrade
function from the mUSD contract to simplify the deployment of the mUSD contract. Theupgrade
was only used for the last upgrade and is dependent on theMigrator
library. It’s easier to deploy mIUSD with just a dependency on theMassetManagerV4
library rather than bothMassetManagerV4
and theMigrator
libraries.
mUSD upgrade process on mainnet
- Deploy the new
MassetManagerV4
library. - Deploy the new
MusdV4
contract that is linked to the previousMassetManagerV4
library. - Propose the upgrade of the mUSD proxy by calling
proposeUpgrade
on the deployed proxy admin contract using the Protocol DAO Safe. The lastdata
param is just0x
asinitialize
should not called.- Delayed Proxy Admin 0x5c8eb57b44c1c6391fc7a8a0cf44d26896f92386
- mUSD proxy 0xe2f2a5c287993345a840db3b0845fbc70f5935a5
- After one week from the proposed upgrade has been executed, accept the mUSD proxy contract upgrade by calling
acceptUpgrade
on the proxy admin contract using the Protocol DAO Safe.- Delayed Proxy Admin 0x5c8eb57b44c1c6391fc7a8a0cf44d26896f92386
- mUSD proxy 0xe2f2a5c287993345a840db3b0845fbc70f5935a5
- Call
accrueInterest()
on the cUSDC token. This is so all the USDC in Compound is withdrawn when the bAsset migration is done. More specifically, the Compound integrator contract converts required USDC to cUSDC tokens. This usesexchangeRateStored
on the cUSDC token which does not take into account any accrued interest. - Collect and stream the remaining platform interest by calling
collectAndStreamInterest
on the SavingsManager for the mUSD proxy.- Savings Manager 0xBC3B550E0349D74bF5148D86114A48C3B4Aa856F
- mUSD proxy 0xe2f2a5c287993345a840db3b0845fbc70f5935a5
- The Protocol DAO Safe calls
migrateBassets
on the mUSD proxy passing in each of the bAsset addresses. (sUSD, USDC, DAI and USDT). - The Protocol DAO Safe calls
setFees
on mUSD proxy with zero value for the swap and redemption fees.- mUSD proxy 0xe2f2a5c287993345a840db3b0845fbc70f5935a5
- The Protocol DAO Safe calls
setWeightLimits
on mUSD proxy with min of 5% (5e16) and max 95% (95e17).- mUSD proxy 0xe2f2a5c287993345a840db3b0845fbc70f5935a5
mBTC changes on mainnet
- Rename the
Manager
library toMassetManagerBtcV2
so the new library can be deployed and not the old library. - Upgrade the
migrateBassets
function in theMassetManagerBtcV2
library so the new integration contract can be a zero address. This will withdraw all the bAssets from the old integrated platform and leave the bAssets in the mBTC contract. - Rename the
Masset
contract toMassetBtcV2
so the new mUSD implementation can be deployed. - Remove the
initialize
function from the mBTC contract to simplify the deployment of the mBTC contract.
mBTC upgrade process on mainnet
- Deploy the new
MassetManagerBtcV2
library. - Deploy the new
MassetBtcV2
contract that is linked to the previousMassetManagerBtcV2
library - Propose the upgrade of the mBTC proxy by calling
proposeUpgrade
on the deployed proxy admin contract using the Protocol DAO Safe. The lastdata
param is just0x
asinitialize
should not called.- Delayed Proxy Admin 0x5c8eb57b44c1c6391fc7a8a0cf44d26896f92386
- mBTC proxy 0x945Facb997494CC2570096c74b5F66A3507330a1
- After one week from the proposed upgrade has been executed, accept the mBTC proxy contract upgrade by calling
acceptUpgrade
on the proxy admin contract using the Protocol DAO Safe.- Delayed Proxy Admin 0x5c8eb57b44c1c6391fc7a8a0cf44d26896f92386
- mBTC proxy 0x945Facb997494CC2570096c74b5F66A3507330a1
- Collect and stream the remaining platform interest by calling
collectAndStreamInterest
on the SavingsManager for the mBTC proxy.- Savings Manager 0xBC3B550E0349D74bF5148D86114A48C3B4Aa856F
- mBTC proxy 0x945Facb997494CC2570096c74b5F66A3507330a1
- The Protocol DAO Safe calls
migrateBassets
on the mBTC contract passing in the WBTC bAsset address. - The Protocol DAO Safe calls
setFees
on mBTC proxy with zero values for the swap and redemption fees.- mBTC proxy 0x945Facb997494CC2570096c74b5F66A3507330a1
- The Protocol DAO Safe calls
setWeightLimits
on mBTC proxy with min of 5% (5e16) and max 95% (95e17).- mBTC proxy 0x945Facb997494CC2570096c74b5F66A3507330a1
mUSD Polygon contract changes
- Rename the
MassetManager
library toMassetManagerV2
so the new library can be deployed and not the old library. - Upgrade the
migrateBassets
function in theMassetManager
library so the new integration contract can be a zero address. This will withdraw all the bAssets from the old integrated platform and leave the bAssets in the mUSD contract. - Rename the
Masset
contract toMassetPolygon
so the new mUSD implementation can be deployed. - Rename references of
MassetManager
toMassetManagerV2
. - Remove the
initialize
function fromMassetPolygon
.
mUSD upgrade process on Polygon
- Deploy the new
MassetManagerV2
library. - Deploy the new
MassetPolygon
contract that is linked to the previousMassetManagerV2
library and the existingMassetLogic
library- MassetLogic library 0xb9cca2b53e8d7bc4cbddccb66d20b411b87d213f
- Propose the upgrade of the mUSD proxy by calling
proposeUpgrade
on the deployed proxy admin contract using the Protocol DAO Safe. The lastdata
param is just0x
asinitialize
should not called.- Delayed Proxy Admin 0xCb6E4B67f2cac15c284AB49B6a4A671cdfe66711
- mUSD proxy 0xE840B73E5287865EEc17d250bFb1536704B43B21
- After one week from the proposed upgrade has been executed, accept the mUSD proxy contract upgrade by calling
acceptUpgrade
on the proxy admin contract using the Protocol DAO Safe.- Delayed Proxy Admin 0xCb6E4B67f2cac15c284AB49B6a4A671cdfe66711
- mUSD proxy 0xE840B73E5287865EEc17d250bFb1536704B43B21
- Collect and stream the remaining platform interest by calling
collectAndStreamInterest
on the SavingsManager for the mUSD proxy.- Savings Manager 0xBC3B550E0349D74bF5148D86114A48C3B4Aa856F
- mUSD proxy 0xE840B73E5287865EEc17d250bFb1536704B43B21
- The Protocol DAO Safe calls
migrateBassets
on the mUSD proxy passing in each of the bAsset addresses. (USDC, DAI and USDT). - The Protocol DAO Safe calls
setFees
on mUSD proxy with zero values for the swap and redemption fees.- mUSD proxy 0xE840B73E5287865EEc17d250bFb1536704B43B21
- The Protocol DAO Safe calls
setWeightLimits
on mUSD proxy with min of 5% (5e16) and max 95% (95e17).- mUSD proxy 0xE840B73E5287865EEc17d250bFb1536704B43B21
Feeder Pools
Mainnet
- Collect interest for the BUSD, GUSD, alUSD, RAI and FEI Feeder Pools for by manually running the
ETH - Collect and validate Feeder Pool interest
Autotask. - Upgrade the Feeder Pool’s
migrateBassets
to support migrating bAssets from platforms back to the Feeder Pool contract. - ProtocolDAO collects governance fees from feeder pools by calling
collectGovFees
on the Feeder Pool Interest Validator.
GUSD & BUSD Feeder Pool contract changes
- Rename the
FeederManager
library toFeederManagerV2
so the new library can be deployed and not the old library. - Upgrade the
migrateBassets
function in theFeederManagerV2
library so the new integration contract can be a zero address. This will withdraw all the bAssets from the old integrated platform and leave the bAssets in the Feeder Pool proxy. - Rename the
FeederPool
contract toFeederPoolV2
so the new Feeder Pool implementation can be deployed. - Remove the
initialize
function from the Feeder Pool contract. - Add a new
cachePlatformIntegration
function to theFeederPoolV2
contract that will take a bAsset address and withdraw amount. This function will withdraw bAssets from the platform integration with the recipient the integration contract, the amount as zero and the total amount as the passed in withdraw amount parameter.
GUSD Feeder Pool upgrade process
- Deploy the new
FeederManagerV2
library that can be reused by GUSD, BUSD, alUSD, RAI and FEI Feeder Pools. - Deploy the new
FeederPoolV2
contract that is linked to the previousFeederManagerV2
library. - Propose the upgrade of the GUSD Feeder Pool proxy by calling
proposeUpgrade
on the deployed proxy admin contract using the Protocol DAO Safe. The lastdata
param is just0x
asinitialize
should not called.- Delayed Proxy Admin 0x5c8eb57b44c1c6391fc7a8a0cf44d26896f92386
- GUSD Feeder Pool proxy 0x4fB30C5A3aC8e85bC32785518633303C4590752d
- After one week from the proposed upgrade has been executed, accept the GUSD proxy contract upgrade by calling
acceptUpgrade
on the proxy admin contract using the Protocol DAO Safe.- Delayed Proxy Admin 0x5c8eb57b44c1c6391fc7a8a0cf44d26896f92386
- GUSD Feeder Pool proxy 0x4fB30C5A3aC8e85bC32785518633303C4590752d
- Collect and stream the remaining platform interest by calling
collectAndValidateInterest
on the Feeder Pool Interest Validator for the GUSD proxy.- Interest Validator 0xf1049aeD858C4eAd6df1de4dbE63EF607CfF3262
- GUSD Feeder Pool proxy 0x4fB30C5A3aC8e85bC32785518633303C4590752d
- The Protocol DAO Safe calls
migrateBassets
on the GUSD proxy passing in the GUSD bAsset address.- GUSD Feeder Pool proxy 0x4fB30C5A3aC8e85bC32785518633303C4590752d
- GUSD token 0x056fd409e1d7a124bd7017459dfea2f387b6d5cd
- The Protocol DAO Safe calls
setFees
on GUSD proxy with zero value for the swap, redemption and governance fees.- GUSD Feeder Pool proxy 0x4fB30C5A3aC8e85bC32785518633303C4590752d
- The Protocol DAO Safe calls
setWeightLimits
on GUSD proxy with min of 5% (5e16) and max 95% (95e17).- GUSD Feeder Pool proxy 0x4fB30C5A3aC8e85bC32785518633303C4590752d
- The Protocol DAO Safe calls
cachePlatformIntegration
on GUSD proxy with mUSD address as the bAsset and withdraw amount as the mUSD balance in the cymUSD contract. This is the available mUSD liquidity in Iron Bank.- GUSD Feeder Pool proxy 0x4fB30C5A3aC8e85bC32785518633303C4590752d
- mUSD token 0xe2f2a5c287993345a840db3b0845fbc70f5935a5
- cymUSD 0xBE86e8918DFc7d3Cb10d295fc220F941A1470C5c
- Repeat until the entirety of mUSD is withdrawn
BUSD Feeder Pool upgrade process
- Deploy the new
FeederPoolV2
contract that is linked to theFeederManagerV2
library deployed in the GUSD process. - Propose the upgrade of the BUSD Feeder Pool proxy by calling
proposeUpgrade
on the deployed proxy admin contract using the Protocol DAO Safe. The lastdata
param is just0x
asinitialize
should not called.- Delayed Proxy Admin 0x5c8eb57b44c1c6391fc7a8a0cf44d26896f92386
- BUSD Feeder Pool proxy 0xfE842e95f8911dcc21c943a1dAA4bd641a1381c6
- After one week from the proposed upgrade has been executed, accept the BUSD proxy contract upgrade by calling
acceptUpgrade
on the proxy admin contract using the Protocol DAO Safe.- Delayed Proxy Admin 0x5c8eb57b44c1c6391fc7a8a0cf44d26896f92386
- BUSD Feeder Pool proxy 0xfE842e95f8911dcc21c943a1dAA4bd641a1381c6
- Collect and stream the remaining platform interest by calling
collectAndValidateInterest
on the Feeder Pool Interest Validator for the BUSD proxy.- Interest Validator 0xf1049aeD858C4eAd6df1de4dbE63EF607CfF3262
- BUSD Feeder Pool proxy 0xfE842e95f8911dcc21c943a1dAA4bd641a1381c6
- The Protocol DAO Safe calls
migrateBassets
on the BUSD proxy passing in the BUSD and mUSD bAsset addresses.- BUSD Feeder Pool proxy 0xfE842e95f8911dcc21c943a1dAA4bd641a1381c6
- BUSD token 0x4Fabb145d64652a948d72533023f6E7A623C7C53
- mUSD token 0xe2f2a5c287993345a840db3b0845fbc70f5935a5
- The Protocol DAO Safe calls
setFees
on BUSD proxy with zero value for the swap, redemption and governance fees.- BUSD Feeder Pool proxy 0xfE842e95f8911dcc21c943a1dAA4bd641a1381c6
- The Protocol DAO Safe calls
setWeightLimits
on BUSD proxy with min of 5% (5e16) and max 95% (95e17).- BUSD Feeder Pool proxy 0xfE842e95f8911dcc21c943a1dAA4bd641a1381c6
RAI Feeder Pool contract changes
- Rename the
FeederManager
library toFeederManagerV2
so the new library can be deployed and not the old library. - Upgrade the
migrateBassets
function in theFeederManagerV2
library so the new integration contract can be a zero address. This will withdraw all the bAssets from the old integrated platform and leave the bAssets in the Feeder Pool contract. - Rename the
NonPeggedFeederPool
contract toNonPeggedFeederPoolV2
so the new Feeder Pool implementation can be deployed. - Remove the
initialize
function from the Feeder Pool contract.
RAI Feeder Pool upgrade process
- Deploy the new
NonPeggedFeederPoolV2
contract that is linked to theFeederManagerV2
library deployed in the GUSD process. - Propose the upgrade of the RAI Feeder Pool proxy by calling
proposeUpgrade
on the deployed proxy admin contract using the Protocol DAO Safe. The lastdata
param is just0x
asinitialize
should not called.- Delayed Proxy Admin 0x5c8eb57b44c1c6391fc7a8a0cf44d26896f92386
- RAI Feeder Pool proxy 0x36F944B7312EAc89381BD78326Df9C84691D8A5B
- After one week from the proposed upgrade has been executed, accept the RAI proxy contract upgrade by calling
acceptUpgrade
on the proxy admin contract using the Protocol DAO Safe.- Delayed Proxy Admin 0x5c8eb57b44c1c6391fc7a8a0cf44d26896f92386
- RAI Feeder Pool proxy 0x36F944B7312EAc89381BD78326Df9C84691D8A5B
- Collect and stream the remaining platform interest by calling
collectAndValidateInterest
on the Feeder Pool Interest Validator for the RAI proxy.- Interest Validator 0xf1049aeD858C4eAd6df1de4dbE63EF607CfF3262
- RAI Feeder Pool proxy 0x36F944B7312EAc89381BD78326Df9C84691D8A5B
- The Protocol DAO Safe calls
migrateBassets
on the RAI proxy passing in the RAI address.- RAI Feeder Pool proxy 0x36F944B7312EAc89381BD78326Df9C84691D8A5B
- RAI token 0x03ab458634910aad20ef5f1c8ee96f1d6ac54919
- The Protocol DAO Safe calls
setFees
on RAI proxy with zero value for the swap, redemption and governance fees.- RAI Feeder Pool proxy 0x36F944B7312EAc89381BD78326Df9C84691D8A5B
- The Protocol DAO Safe calls
setWeightLimits
on RAI proxy with min of 5% (5e16) and max 95% (95e17).- RAI Feeder Pool proxy 0x36F944B7312EAc89381BD78326Df9C84691D8A5B
FEI Feeder Pool contract changes
- Rename the
FeederPool.sol
file toFeiFeederPool.sol
- Rename the
FeederManager
library toFeederManagerV2
so the new library can be deployed and not the old library. - Upgrade the
migrateBassets
function in theFeederManagerV2
library so the new integration contract can be a zero address. This will withdraw all the bAssets from the old integrated platform and leave the bAssets in the Feeder Pool contract. - Rename the
FeederPool
contract toFeiFeederPool
so the new Fei Feeder Pool implementation can be deployed. - Remove the
initialize
function from the Feeder Pool contract.
FEI Feeder Pool upgrade process
- Deploy the new
FeiFeederPool
contract that is linked to theFeederManagerV2
library deployed in the GUSD process. - Propose the upgrade of the FEI Feeder Pool proxy by calling
proposeUpgrade
on the deployed proxy admin contract using the Protocol DAO Safe. The lastdata
param is just0x
asinitialize
should not called.- Delayed Proxy Admin 0x5c8eb57b44c1c6391fc7a8a0cf44d26896f92386
- FEI Feeder Pool proxy 0x2F1423D27f9B20058d9D1843E342726fDF985Eb
- After one week from the proposed upgrade has been executed, accept the FEI proxy contract upgrade by calling
acceptUpgrade
on the proxy admin contract using the Protocol DAO Safe.- Delayed Proxy Admin 0x5c8eb57b44c1c6391fc7a8a0cf44d26896f92386
- FEI Feeder Pool proxy 0x2F1423D27f9B20058d9D1843E342726fDF985Eb
- Collect and stream the remaining platform interest by calling
collectAndValidateInterest
on the Feeder Pool Interest Validator for the FEI proxy.- Interest Validator 0xf1049aeD858C4eAd6df1de4dbE63EF607CfF3262
- FEI Feeder Pool proxy 0x2F1423D27f9B20058d9D1843E342726fDF985Eb
- The Protocol DAO Safe calls
migrateBassets
on the FEI proxy passing in the FEI address.- FEI Feeder Pool proxy 0x2F1423D27f9B20058d9D1843E342726fDF985Eb
- FEI token 0x956f47f50a910163d8bf957cf5846d573e7f87ca
- The Protocol DAO Safe calls
setFees
on FEI proxy with zero value for the swap, redemption and governance fees.- FEI Feeder Pool proxy 0x2F1423D27f9B20058d9D1843E342726fDF985Eb
- The Protocol DAO Safe calls
setWeightLimits
on FAI proxy with min of 5% (5e16) and max 95% (95e17).- FEI Feeder Pool proxy 0x2F1423D27f9B20058d9D1843E342726fDF985Eb
Polygon Frax Feeder Pool
- Collect interest for the FRAX Feeder Pool for running Hardhat task
feeder-collect-interest
. - ProtocolDAO collects governance fees from feeder pools by calling
collectGovFees
on the Feeder Pool Interest Validator. - Governance fees are transferred back to mainnet Treasury multi-sig.
- The contract does not need upgrading as the FRAX and mUSD is not integrated to any lending platforms.
- The Protocol DAO Safe calls
setFees
on FRAX proxy with zero value for the swap, redemption and governance fees.- FRAX Feeder Pool proxy: 0xB30a907084AC8a0d25dDDAB4E364827406Fd09f0
- The Protocol DAO Safe calls
setWeightLimits
on FRAX proxy with min of 5% (5e16) and max 95% (95e17).- FRAX Feeder Pool proxy: 0xB30a907084AC8a0d25dDDAB4E364827406Fd09f0
Meta Vaults
3Pool Convex Meta Vault contract changes
Upgrade Curve3CrvAbstractMetaVault
, PeriodicAllocationPerFeeMetavault
and Convex3CrvAbstractVault
to support withdrawing all assets from underlying vaults. Withdraw all assets for all vaults and allow withdraw proportional to user shares. Modify deposit
and redeem
to not do anything for all vaults (Convex, Curve and Cache Meta Vault). Modify totalAssets
in SameAssetsUnderlyingVault
to not include underlying assets.
The following contract change will be made:
- Create a function
liquidateUnderlyingVault
inCurve3CrvAbstractMetaVault
that can only be called by the ProtocolDAO. This will remove all liquidity from the 3Crv Pool and leave USDC in the contract. - Modify
deposit
andmint
to not do anything for all vaults (Convex, Curve, and Cache Meta Vault). - Modify
totalAssets
inSameAssetsUnderlyingVault
to not include underlying assets. - Modify
redeem
andwithdraw
to issue assets based on the proportion ofshares
3Pool Convex Meta Vault upgrade process
- ProtocolDAO calls
pause
on all vaults to avoid any action during the upgrade- vcx3CRV-mUSD proxy: 0xB9B47E72819934d7A5d60Bf08cD2C78072383EBb
- vcx3CRV-FRAX proxy: 0x98c5910823C2E67d54e4e0C03de44043DbfA7ca8
- vcx3CRV-BUSD proxy: 0x87Ed92648fAE3b3930577c92c8A247b127ED8949
- mv3CRV-CVX proxy: 0x9614a4C61E45575b56c7e0251f63DCDe797d93C5
- mvUSDC-3PCV proxy: 0x455fB969dC06c4Aa77e7db3f0686CC05164436d2
- ProtocolDAO deploys new implementation contracts and proposes the upgrade
- Upgrade the Meta Vault proxy by calling u
pgrade
on the instant proxy admin contract using the Protocol DAO Safe. The lastdata
param is just0x
asinitialize
should not be called.- Instant Proxy Admin 0x3517F5a251d56C768789c22E989FAa7d906b5a13
- vcx3CRV-mUSD proxy: 0xB9B47E72819934d7A5d60Bf08cD2C78072383EBb
- vcx3CRV-FRAX proxy: 0x98c5910823C2E67d54e4e0C03de44043DbfA7ca8
- vcx3CRV-BUSD proxy: 0x87Ed92648fAE3b3930577c92c8A247b127ED8949
- mv3CRV-CVX proxy: 0x9614a4C61E45575b56c7e0251f63DCDe797d93C5
- mvUSDC-3PCV proxy: 0x455fB969dC06c4Aa77e7db3f0686CC05164436d2
- ProtocolDAO calls
removeVault
to withdraw all assets from the underlying.- mv3CRV-CVX proxy: 0x9614a4C61E45575b56c7e0251f63DCDe797d93C5
removeVault(2)
to remove vcx3CRV-BUSDremoveVault(1)
to remove vcx3CRV-mUSDremoveVault(0)
to **remove **vcx3CRV-FRAX
- mv3CRV-CVX proxy: 0x9614a4C61E45575b56c7e0251f63DCDe797d93C5
- ProtocolDAO calls
liquidateUnderlyingVault()
to ****remove all liquidity from Curve- mvUSDC-3PCV proxy: 0x455fB969dC06c4Aa77e7db3f0686CC05164436d2
- PrococolDAO unpauses the vaults with
unpause
. This restores the functionality and assets are and will be available to be withdrawn- vcx3CRV-mUSD proxy: 0xB9B47E72819934d7A5d60Bf08cD2C78072383EBb
- vcx3CRV-FRAX proxy: 0x98c5910823C2E67d54e4e0C03de44043DbfA7ca8
- vcx3CRV-BUSD proxy: 0x87Ed92648fAE3b3930577c92c8A247b127ED8949
- mv3CRV-CVX proxy: 0x9614a4C61E45575b56c7e0251f63DCDe797d93C5
- mvUSDC-3PCV proxy: 0x455fB969dC06c4Aa77e7db3f0686CC05164436d2
Nexus
The last step after all of the above is implemented AND all changes to staking, MTA, Emissions Controller are implemented (separate Proposal).
The Protocol DAO’s Gnosis Safe calls changeGovernor
on the Nexus contract with address 0x000000000000000000000000000000000000dEaD
Affected addresses Mainnet:
- Nexus 0xafce80b19a8ce13dec0739a1aab7a028d6845eb3
- Delayed Proxy Admin 0x5c8eb57b44c1c6391fc7a8a0cf44d26896f92386
- Instant Proxy Admin 0x3517F5a251d56C768789c22E989FAa7d906b5a13
- Gnosis Safe used by the Protocol DAO 0xF6FF1F7FCEB2cE6d26687EaaB5988b445d0b94a2
Affected addresses Polygon:
- Nexus 0x3C6fbB8cbfCB75ecEC5128e9f73307f2cB33f2f6
- Delayed Proxy Admin 0xCb6E4B67f2cac15c284AB49B6a4A671cdfe66711
- Instant Proxy Admin 0x3517F5a251d56C768789c22E989FAa7d906b5a13
- Gnosis Safe used by the Protocol DAO 0x429F29A3A36B1B977C3d4Ec77C695c3391e7B9E